Create and manage work packages > Manage work package
Add a product structure to a work package
Note
This task is optional. You only need to add a product structure such as an EBOM or an MBOM to the work package if you want to display product assemblies in the steps of the manufacturing process. After you add a product structure to the work package, you associate it to operations in the plant BOP.
Procedure
Search for and open a work package.
On the Manage Work Package page, in the Product panel, click Add Product .
In the Add Product to Work Package dialog box, type the name, ID, or description of a product or product assembly to associate to the package.
Click Search .
Select the product or product assembly from the search results.
(Optional) Select a different revision rule.
Note Your Teamcenter administrator may customize the list of revision rules.
- Click Add Product.
What to do next
Note
To remove a product structure from a work package, edit the work package. Hover over the structure in the work package and click Unassign .
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.xid2214895/xid1395567 · retrieved 2026-07-11