ManufacturingKnowledge

Authoring manufacturing process plans > Creating process structures > Sequencing processes with the PERT view

Assign a part with a specific occurrence type

Procedure

  1. In the structure view containing the part that you want to assign, copy the part.

  2. In the associated PERT chart, right-click the node to which you want to assign the part and choose Paste As and select the appropriate occurrence type.

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/id1249980 · retrieved 2026-07-11