ManufacturingKnowledge

Configuring Teamcenter Easy Plan > Configuring common Easy Plan options > Configure manufacturing time

Configure time study preferences

You can use these preferences to manage time study preferences in your environment.

You must add each preference you use to the AWC_StartupPreferences in the Teamcenter rich client. See Working with preferences in Active Workspace for a description of preferences and how to set them.

  • EP_OperationPageActivitiesTabActivitiesGridAreaColumnConfiguration—controls the column configuration of the Time Management panel.

  • EP_TimeStudiesTableColumnConfiguration—controls the column configuration of the Time Study table on the Process Planning page. This table shows the properties of the object revision, and not those of the BOM line.

  • EP_TimeStudyTreeColumnConfiguration—controls the column configuration of the time study tree on the Time Study page.

  • EP_TimeStudyPlantBopColumnConfiguration—controls the column configuration of the plant BOP tree on the Time Study page.

  • IsolatedStudySyncPublish—controls the closure rule that is used to search the objects that are used for publishing.

  • Mfg0MEPlantBOP.Mfg0TimeStudy.CopyPasteTemplate—controls what data is created in a time study.

  • StudyPlanningTimeBasedPublishRule—controls what information is published from the Planning Time Study to the plant BOP.

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.EasyPlan_Deployment/tps1733094137257 · retrieved 2026-07-11