Create and manage work packages > Add structure > Product structures and data
Create a structure in a work package
You can create any of these structures within an existing work package:
Bill of Equipment (BOE)
Manufacturing Bill of Materials (MBOM)
Plant Bill of Process (Plant BOP)
Before you begin, verify the following items.
You must have the correct user role and permissions to create structures in Teamcenter.
You must have write access to the object you are changing. In this case, you are changing the work package.
The object must be in an Open and Not Reviewing state.
Note
If you do not have the correct user role and permissions to complete this task, please contact your Teamcenter administrator.
Search for and open a work package.
Caution The work package must contain an EBOM before you can add a manufacturing BOM.
Click Add in a structure tile and then select Create New [structure].
In the Create dialog box, type a Name.
(Optional) Type a description.
(Optional) Click Assign Projects , then search for and select the owning project to assign to the structure.
(Optional) Click Revision Rule, and select an option from the list .
Note The default revision rule is Latest Working.
Click Add [structure].
Note The tasks that are available on the Manage Work Package page depend on the structures in a work package.