Multi-BOM Management general functionality > Running accountability checks > Running an accountability check or propagation in batch mode
Schedule an accountability check report
Procedure
- Select the structures that you want to compare and choose Tools→Accountability Check→Schedule Accountability Check Report.
This dialog box is very similar to the regular Accountability Check dialog box with the exception of the Reporting tab and an additional Scheduling tab. If you want to add structures you can do so within this dialog box.
Enter the comparison criteria in the Scope, Equivalence, and Partial Match tabs of the Schedule Accountability Check Report dialog box.
On the Reporting tab, type the name of the report.
The default report name prefix is Accountability Check Report. The final report dataset has a date timestamp appended to the report name prefix. The timestamp represents the time at the server. If your Teamcenter server is in another country, this time may be different than your own.
Select the types of results you want in the report.
On the Scheduling tab, schedule the time that you want the report to run. You can also choose to execute the task immediately.
Click OK.
Teamcenter sends the request to the Dispatcher and the user interface is immediately available for further work. If you choose to generate a report on a recurring basis, Teamcenter creates a request for each recurrence day. For example, if you choose to have a report generated on Mondays and Wednesdays, Teamcenter creates two Dispatcher requests. You can monitor the status of the Dispatcher request using the Dispatcher Request Administration Console. If you create a request with multiple occurrences, the Dispatcher Request Administration Console displays the following:
Start time The time that the you submitted the request.
End time The time that the request ends. This can be:
Determined by Teamcenter. If you schedule a daily or weekly accountability check with a specific number of occurrences, Teamcenter calculates the end date.
Determined by you. If you schedule a daily or weekly accountability check with a specific end date, Teamcenter displays the end time that you enter.
Time interval This is the time that the Dispatcher waits between jobs assuming they are within the start time and end time range. If you select Execute immediately, the time interval is 0.
Results
When the report is generated, it is attached as a dataset to the target structure. If you do not have write access to the target structure, it is stored in the Newstuff folder in your Home folder.
Related Topics
Run an advanced accountability check
Set the result reporting options
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.xid1364469/xid480244 · retrieved 2026-07-11