Define the scope of an assembly to a level in the plant BOP

You can associate assemblies and subassemblies in a manufacturing bill of materials (MBOM) to a specific level in the plant bill of product (BOP) during process planning.

  1. Open a work package that contains processes and parts.

  2. Navigate the plant BOP to a process area or process line that contains process stations.Note While the plant BOP loads, the associated MBOM also loads in tree view.

  3. In the MBOM tree, select and drag a subassembly onto an object, such as an area or a line, in the Process Sequence panel.Note You cannot create a scope to the operation level of a plant BOP. The application creates a scope of the subassembly to the plant BOP at the selected level. The Target Assemblies tab lists the new association.

  4. (Optional) To remove a scope, select the subassembly in the Target Assemblies tab and click Remove .

  5. (Optional) To continue process planning, you can drill down in the plant BOP structure.Example If you are working on a process line, you can open a process station.