Verifying structure design > Modifying process plan data
Edit operation resources
Procedure
In the process structure, select the resource to be removed. To select multiple resources, either hold the shift key (for contiguous objects) or control key (for noncontiguous objects) while clicking resources in the list.
On the Edit menu, choose Remove, or click the Remove a Line button on the toolbar.
Assign new resources as necessary.
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.pmphelp/pmpa0717 · retrieved 2026-07-11