Collaboration and CAM integration > Using Multi-Site Collaboration
Sharing compositions
If you create a process in site B and import it to site A using the following procedure, the assigned product/plant information is not displayed in the structure:
Create process in site B and assign a product/plant.
Close and restart Part Planner.
Create a top-level process in site A.
Open My Teamcenter and copy the process created in step 1.
Paste the process under top-level process created in step 3.
When you create a root process and paste in another process, the product and plant are not displayed. Pasting the process does not automatically populate these structures. You can work around this problem as follows:
Load the old product and plant structures into Part Planner. The assignments appear in the process structure.
Ensure that the product and plant load automatically the next time you open the new process in Part Planner. To do this:
Use the Associate commands to link the roots.
Related Topics
- Creating a relationship between product and process structures