Authoring manufacturing process plans > 4D planning – visualizing construction over time
Open a schedule
Do one of the following:
Select a process that is associated to a schedule task and choose Tools→Schedule→Open Associated Schedule or right-click the process and choose Open Associated Schedule from the shortcut menu.
Use the Open by Name feature:
Click and select Open Schedule from the list.
Type the name of the schedule and click Find.
Double-click the desired schedule in the list.
- Select a schedule in Schedule Manager or My Teamcenter and choose Send To→Manufacturing Process Planner from the shortcut menu.