ManufacturingKnowledge

Verifying structure design > Managing incremental changes

View or edit information about an incremental change

Do one of the following:

  • Click the View/edit current IC information button .

  • Click More IC Info in the Incremental Change data tab.

Teamcenter displays the View/edit Change dialog box, which includes the following tabs:

  • IC Attributes shows the change object name, description, and tag type.

  • Incremental Changes shows the individual changes to activities, components, attachments, created/deleted data, and predecessors that are tracked against this incremental change.Note A replacement is shown as an override.

  • Effectivity allows you to view and edit the effectivity of the change object if you have the access permission to do so. Double-click a specific release status to open a dialog box containing all the effectivity information for the selected release status.

  • Intents displays the intents for which the incremental change is valid.You can create a new intent by clicking the Intent button and typing the appropriate information in the Create Intent dialog box. You can then add the intent to the incremental change by ensuring it appears in the Intent to add box and clicking +. You can also search for existing intents and add them to the incremental change.Note To make the Intents tab visible, set the EnableIntents preference to true.

You can also use the icons on a structure line to identify adds, removes, and absolute occurrences. For attachments, these icons are displayed in the Attachments view, not the structure view.

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.pmphelp/pmp0980 · retrieved 2026-07-11