ManufacturingKnowledge

Getting started with Easy Plan > Managing data

Rules for dragging elements from BOM to BOP

General rules exist for dragging elements from BOM panels and tabs to BOP panels on task pages.

For more information on how to drag elements , see Drag or copy elements across task page panels and tabs.

Drag from: On the High Level Planning page On the Process Planning page On the Work Instructions Authoring page (Process panel) On the Work Instructions Authoring page (Editor panel)
BOM – MBOM, assembly, or target assembly
Resources – resources, equipment, tooling NA NA NA
Resources – work areas NA NA NA
Background parts (DIPA) NA
Documents
Files
Inspection definitions
Classified resources, from the Manufacturing Resource Library (MRL) window or Active Workspace folder
Drag from: On the High Level Planning page On the Process Planning page On the Work Instructions Authoring page (Process panel) On the Work Instructions Authoring page (Editor panel)
BOM – MBOM, assembly, or target assembly
Resources – resources, equipment, tooling NA NA NA
Resources – work areas NA NA NA
Background parts (DIPA) NA NA NA NA
Documents
Files
Inspection definitions
Classified resources, from the Manufacturing Resource Library (MRL) window or Active Workspace folder
Drag from: On the Product BOP page
BOM (MBOM)
Resources – resources, equipment, tooling NA
Resources – work areas NA
Background parts (DIPA) NA
Documents
Files
Inspection definitions NA
Classified resources, from the Manufacturing Resource Library (MRL) window or Active Workspace folder

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.xid2214895/skm1699460696055 · retrieved 2026-07-11