Manufacturing Process Planner general functionality > Comparing structures and propagating changes > Running an advanced accountability check > Narrowing the scope of the accountability check
Inclusion rules
| Inclusion rule | Description |
|---|---|
| AccountabilityAll | Includes all lines. |
| AccountabilityLeavesOnly | Includes only leaf nodes; excludes all hierarchy nodes. |
| AccountabilityLinkedAssm OrLeaves | Includes assigned assembly nodes but excludes their children. If an assembly is not assigned, includes its leaf nodes. |
| AccountabilityProcess Consumption | Includes assigned nodes under a process or operation that are of occurrence type MEConsumed. Excludes all process and operation nodes. |
| AccountabilityProcess Assignments | Includes assigned nodes (including work areas, parts, and tools) under processes and operations. Excludes all processes and operations nodes. If the assigned-from structure is not loaded, those nodes are also excluded. |
| AccountabilityProcessAll NoAssign | Include process and operation nodes. |
| AccountabilityProcessAll | Include process and operation nodes and all of their assigned nodes. If the assigned structure is not loaded, their nodes are excluded. |
| AccountabilityProcessOnly WithPA | Includes processes, operations, and process areas only. |
| ACPlantBOPDerivedProcesses AndOps | Includes only operations and processes that are linked to the source (for example, in a product BOP). This rule is used when comparing a product BOP to a plant BOP and skips plant-specific operations. |
Note
None of the inclusion rules include occurrence group nodes, but they can include the children under those nodes.
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/id1678779 · retrieved 2026-07-11