Manage BOP > Product assignment > Plant BOP process area planning
Locate assigned target assemblies in a plant BOP
You can review MBOM assemblies that have been assigned as target assemblies to a plant BOP.
Procedure
In a work package that contains a plant bill of process (BOP), navigate to the High Level Planning task page.
In the Assembly panel, select one or more assemblies, and in the BOP panel, select a process or operation object.
Turn on the Identify Target Assemblies control. A blue bar in the Assembly panel indicates each MBOM assembly that is assigned as a target assembly. A blue bar in the BOP panel indicates the plant BOP location. Child parts and assemblies assigned to the BOP object are indicated by assignment icons .
Click an assignment icon , and from the Consumed Under Scope list, select a BOP assignment such as a station or line. In the BOP panel, the assignment is selected. In the Information panel, the MBOM assembly is selected in the Target Assemblies tab. The tab contains a Find in Assembly button to sync the target assembly selection with the Assembly panel.