Manage BOP > Product assignment > Viewing and analyzing consumption status data
Find a consumed part that is within the current scope
You can use consumption indication icons to locate parts that are consumed within the current scope.
Procedure
If you have not done so already, search for and open an existing work package that contains processes and parts and navigate to the Process Planning, Work Instructions Authoring, or Product BOP Authoring page.
In the Process tab or panel, select a process with assigned parts and click Show Comparison .
Assignment indication icons for consumed parts are displayed in the Parts tab in the information panel. Tip As you assign and remove resources in the structure, consumption indication icons are automatically updated.
Search the Parts tab for these icons.
—The operation is assigned to a process area in the current line balancing scope.
—The operation is assigned to multiple process areas, including areas in the current line balancing scope and possibly in another line balancing scope.
(Optional) Mouse over an icon to get details about where the part is assigned.
(Optional) Click the to icon jump to the process area in the current scope and highlight the operation in the Operations list.
(Optional) Click the icon to see a list of the process areas where the operation is assigned.In the example below, the operation is located in three process areas in the current scope and three in a different scope.
(Optional) Click Show Comparison to deactivate consumption indications for the structure.