ManufacturingKnowledge

Multi-BOM Management general functionality > Running accountability checks > Running an advanced accountability check

Expanding structures to check

Whether or not you need to expand a target structure before running an accountability check depends on the settings of the following two preferences:

  • MECopyIdInContextToAssignedLine

  • MECopyIdInContextLowerLevels

Note

If there are packed lines in the source window, the accountability check may report incorrect results for the quantity of an absolute occurrence of a component that is packed to a sibling. To avoid this situation, always unpack all lines before starting an accountability check.

Expanding a structure based on closure rules also plays a role in which objects are taken into consideration in the accountability check. If you expand using a closure rule, it may have the same effect as setting an inclusion rule.

Related Topics

  • Setting up the accountability check

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.xid1364469/id1157762 · retrieved 2026-07-11