Authoring manufacturing process plans > Creating process structures
Sequence processes without the process flow viewer
When you add an object to a process or plant structure, you often need to add it between existing objects. You can do this by giving the new object a find number that falls between the existing objects. When the existing objects have no number space between them, you need to resequence the structure. For example, you have the existing numbers 11,12,13 and must change these to 10,20,30. If you do not use PERT flows, or intend to use them later in the process, you can resequence the structure as follows:
Procedure
Select the parent object of the structure that you want to resequence.
Choose Tools→Re-Sequence Structure.
Teamcenter displays the Re-sequence dialog box.
Type a start number and increment.
Clear the Consider flows check box.
The default state of this check box is stored in the MEConsiderFlowsOnReSequence preference. After the first time you open the dialog box, the check box state is stored in a cookie.
- Click OK.