ManufacturingKnowledge

Multi-BOM Management general functionality > Multi-BOM Management fundamentals > How perspectives and views work

Display configuration information for a primary view

Do one of the following:

  • Click in a primary structure view to see configuration information about that structure. The Configuration Information dialog box displays the following:

The revision rule.

The effectivity.

The variant rule or rules currently in effect.

Which structure is configuring the current structure.

In-context information.

Currently active incremental change.

  • Ensure that the MEShowConfigurationHeader preference is set to true. This displays the current revision rule, effectivity, and variant rule at the top of the structure view. These entries are links that you can click to open the dialog boxes used to change the configuration.

Related Topics

  • About process configuration

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.xid1364469/id1386594 · retrieved 2026-07-11