Approving/releasing manufacturing process plans
Viewing a PDI
You can view a PDI immediately when the baseline is created. However, the revision rule is not automatically applied when the baseline is loaded, and you must apply it manually.
You can also view the baseline in My Teamcenter and choose the appropriate item revision from the list of available item revisions. You can distinguish baseline revisions from other released revisions by the specific revision ID format as described in Create a baseline of a structure.
After applying the proper configuration rule, you can save the baseline structure and view it in Multi-Structure Manager.
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/impa1501c · retrieved 2026-07-11