Create and manage work packages > Add structure > Product structures and data
Add an existing structure to a work package
You can search for and add any of these structures to a work package:
Bill of Equipment (BOE)
Engineering Bill of Materials (EBOM)
Manufacturing Bill of Materials (MBOM)
Plant Bill of Process (Plant BOP)
This example searches for and adds an EBOM to an existing work package.
Procedure
Search for and open a work package.
Tip You must add an EBOM to a work package before you can add an MBOM.
Click Add in the EBOM tile.
Note In your role, you do not create or maintain EBOMs. You only search for and add an EBOM to a work package.
In the Add Product dialog box, type a full or partial name and click Search .
Select the structure or the process from the search results.
(Optional) Click Revision Rule, and select an option from the list .
Note The default revision rule is Latest Working.
Click Add Product.
Tip The tasks that are available on the Manage Work Package page depend on the structures in a work package.
Remove a structure from a work package
Click Remove on a product structure tile to remove it from a work package.
Tip
You must remove an MBOM from a work package before you can remove the EBOM.
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.xid2214895/xid1969716 · retrieved 2026-07-11