Reporting > Work instructions authoring > Authoring a process plan with work instructions
Preview a process plan in Opcenter
Preview a process plan and operations before a product release, to compare your Easy Plan process plan to its translation to Siemens Opcenter.
Note
Opcenter is a unified manufacturing operations management (MOM) solutions portfolio. When Opcenter is installed and the preference EP_OpenInOpcenterUrl has a URL value, the default command Open in EWI is replaced with the command Open in Opcenter.
Prerequisites
Before you can use this feature, your Teamcenter administrator must install and configure Siemens Opcenter.
Procedure
If you have not done so already, search for and open an existing work package that contains processes and operations and navigate to the Process Planning or Work Instructions Authoring page.
In the Process tab or panel, expand the structure and select a process.
Note Select a single process. Multiple process selection is not supported.In the Process tab or panel toolbar, click Show Menu → View in Opcenter .
Results
Opcenter opens to a read-only preview of the process plan data in an Operator Terminal page.
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.xid2214895/uos1697671876332 · retrieved 2026-07-11