Create and manage work packages > Manage work package > Author the BOE
Author the BOE structure
To author the bill of equipment (BOE), complete these tasks.
Create a work package.
Add a plant structure or create a twin station.
(Optional) Assign classified tools and resources to operations.
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.xid2214895/xid1849440 · retrieved 2026-07-11