ManufacturingKnowledge

Authoring manufacturing process plans > Associating product and process structures

Assign a part to a process

Do one of the following:

  • Use the Copy and Paste commands.

Right-click a part revision in a structure view and choose Copy, or click the Copy button on the toolbar.

In the process pane, select the appropriate process and choose Paste.

  • Drag the part to the appropriate process.

By default, if an occurrence type is defined for a BOM line and you assign the BOM line to a process or operation, Teamcenter uses the same occurrence type. However, if your administrator sets the MEAssignCustomizedOccurrenceType preference, you can specify a different occurrence type during the assignment. You can specify the properties that are copied over from part to process during the assignment process using the MEAssignProperties preference.

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/id1669552 · retrieved 2026-07-11