Authoring manufacturing process plans > Associating product and process structures
Assign a part to a process
Do one of the following:
- Use the Copy and Paste commands.
Right-click a part revision in a structure view and choose Copy, or click the Copy button on the toolbar.
In the process pane, select the appropriate process and choose Paste.
- Drag the part to the appropriate process.
By default, if an occurrence type is defined for a BOM line and you assign the BOM line to a process or operation, Teamcenter uses the same occurrence type. However, if your administrator sets the MEAssignCustomizedOccurrenceType preference, you can specify a different occurrence type during the assignment. You can specify the properties that are copied over from part to process during the assignment process using the MEAssignProperties preference.