Managing the enterprise BOP
Restructuring an enterprise BOP structure
You can copy or move operations or processes within the same enterprise BOP structures. If origin links exist, these links are maintained.
The following commands are disabled in a plant BOP structure:
Replace
Replace…
Split occurrence
Paste Substitute
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/id1621995 · retrieved 2026-07-11