ManufacturingKnowledge

Verifying structure design > Modifying process plan data > Understand the Gantt

Change duration times

Do one of the following:

Procedure

  1. Make sure that the Lock editing button is off.

  2. Move the cursor over the end of the time bar until it changes to a double-ended arrow ↔.

  3. Drag the end of the bar to the desired duration time.

-or-

Procedure

  1. Right-click the time bar and choose Show property dialog.

  2. Type a new end time and click OK.

Teamcenter changes the length of the time element to reflect the new time.

Tip

Teamcenter displays the duration time in a tool tip for the process or operation, as well as in the allocated_time column of the view navigation pane.

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.pmphelp/id772686 · retrieved 2026-07-11