Managing bills of equipment > Creating plant structures
Open an existing work area structure
Do one of the following:
Open a work area revision in Manufacturing Process Planner using the Open Work Area dialog box.
Find the work area revision item in My Teamcenter. Using the mouse, drag it to the Manufacturing Process Planner button in the navigation pane; or use the shortcut menu and choose Send To to send it to the Manufacturing Process Planner application.
Open a process revision in Manufacturing Process Planner. The work area most recently assigned as a target by the process is opened by default.The process revision most recently assigned as a target item by this product opens by default if the MSE_load_related_product_process_plant preference is set to true.
Related Topics
- Open structure by name