Manage BOP > Product assignment > Plant BOP process area planning
View and analyze a scoped MBOM assembly
You can view and analyze a scoped manufacturing bill of materials (MBOM) assembly within a plant bill of process (BOP).
Note
Process Planning for BTO/BTS/CTO displays target assemblies based upon scoped parts.
If a station has assigned assemblies or subassemblies, the application displays the target assembly for that station. You see either a partial manufacturing bill of materials (MBOM), or the children assigned to the station.
If a station does not have assigned assemblies or subassemblies, the application displays the target assembly for the parent as the scope of work for the station.
Open a work package that contains processes and parts.
Open a process area with an assembly or subassemblies assigned to it and expand the MBOM structure.The Product panel shows the expanded MBOM. The Process Sequence panel shows the process area.
Drill into the plant structure and open a process station with a target assembly assigned to it. Note The Parts tab shows a partially loaded MBOM in tree view. The MBOM is the target assembly as the scope of work for the Ignition station.
(Optional) Open a station without an assembly or subassemblies assigned to it. Note The station does not have a target assembly assigned to it. The Parts tab is showing the MBOM for the process line, which is the parent object of the station.
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.xid2214895/xid1962209 · retrieved 2026-07-11