ManufacturingKnowledge

Installing or updating TCM Visualization

Add or update TCM Visualization with Deployment Center

You can use the Deployment Center or the Teamcenter Environment Manager (TEM) to perform an installation or an update in your environment. Use these instructions install or update TCM Visualization with the Deployment Center.

Procedure

  1. Add the TCM Visualization software kit to the Deployment Center software repository as described in Manage Repositories in the Deployment Center Guide.

    Note If you created your Teamcenter environment using TEM, register your environment in Deployment Center as described in Register environments in the Deployment Center Guide. Make sure the Active Workspace software kit is in the software repository. Easy Plan applications are included in the Active Workspace software kit. Teamcenter Manufacturing Access is installed during the Active Workspace installation process. You do not need to download a separate kit for configuration.

  2. In Deployment Center, select your existing environment.

  3. In the Applications task, click Edit Selected Applications to add applications.

    The Available Applications panel displays the available applications.

  4. In Available Applications, choose Easy Plan applications:(Optional) Product Configurator Extension for Easy Plan Supports Product Configurator in your environment. Product Configurator allows you to enable definitions for variant formulas on operations. See the Product Configurator (Administrator) documentation for installation details. (Optional) Electronics Process Planner Integrates Process Planning for BTO/BTS/CTO with Valor Electronics Manufacturing Solutions software.

  5. Click Update Selected Applications to add applications to the Selected Applications list.

    The added applications show Pending Install status in the Selected Applications list.

  6. Proceed to the Components task. Select the Microservice Node component and click Show all parameters. Type a unique value in the Port Settings field.

    Caution You must change the port number before you install or update Easy Plan on the Deployment Center. If you do not change this value, the Deployment Center fails during future installations and updates. Each kit that you install must use a unique port number for the Deployment Center.

    Note any components whose configuration status is not 100%. Update each component’s required values, and then click Save Component Settings until all components show a configuration status of 100%.

  7. Proceed to the Deploy task. Click Generate Install Scripts to generate deployment scripts to update affected machines. When script generation is complete, note any special instructions in the Deploy Instructions panel.

  8. Locate deployment scripts, copy each script to its target machine, and run each script on its target machine.For more information about running deployment scripts, see the Deployment Center Guide.

  9. To complete the TCM Visualization installation, update the microservice framework master node and redeploy the Teamcenter web tier (tc.war) as described in the Teamcenter installation guides for Windows and Linux.

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.EasyPlan_Deployment/xid2014332 · retrieved 2026-07-11