Authoring manufacturing process plans > Managing requirements, trace links, and notes > Linking objects using trace links
Viewing downstream and upstream paths
There are several methods for displaying the trace link assignments that you make among and between structures:
The Traceability Matrix view displays the assignments between two selected structures.
You can run an accountability check to compare two structures to ensure all lines in the source structure are consumed in the target structure. For example, you can compare a requirement structure against a product structure, or compare a requirement structure against a manufacturing process structure.
In the Teamcenter Relation Browser view, you can view the trace link hierarchies in a requirement structure.
In the requirement’s Properties dialog box, you can view trace link assignments if the Calculate Defining/Complying Objects option is selected.
Tip
Defining and complying trace links can exist also between Systems Engineering objects and subsets in 4th Generation Design. Using the cross-domain tracing feature, collaborative designers can analyze these elements for change impact both downstream and upstream.
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/id1348867 · retrieved 2026-07-11