ManufacturingKnowledge

Designing process structure > Creating process structures > Sequencing processes with the PERT view

Assign resources using the Classification Search Dialog

Procedure

  1. Select a process or operation PERT node.

  2. Choose Edit→Assign Resource, or click the Assign Resource button on the toolbar.

  3. Expand the Classification Root folder entry in the Classification Search Dialog.

  4. Search the various classes and subclasses to locate and select the appropriate resource.

  5. If necessary, change the occurrence type of the resource by selecting from the Occurrence Type list.Your administrator can modify the occurrence types that are displayed by default in the MEAssignCustomizedOccurrenceType preference.

  6. Click OK to close the Classification Search Dialog.

Results

Teamcenter assigns the resource to the selected node in the PERT chart.

Related Topics

  • Searching for resources overview

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.pmphelp/id1249982 · retrieved 2026-07-11