ManufacturingKnowledge

Authoring manufacturing process plans > Managing collaboration contexts

Pasting under a collaboration context object

When pasting a structure context to a collaboration context or a configuration context to a structure context object, Teamcenter pastes it with an IMAN_CCContext relation. Do not use the Paste As command to change this relation when pasting collaboration context objects. If you change the relation, the associated contexts will no longer load when loading the collaboration context.

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/id1678981 · retrieved 2026-07-11