Inclusion rule Description
AccountabilityAll Includes all lines.
AccountabilityLeavesOnly Includes only leaf nodes; excludes all hierarchy nodes.
AccountabilityLinkedAssm OrLeaves Includes assigned assembly nodes but excludes their children. If an assembly is not assigned, includes its leaf nodes.
AccountabilityProcess Consumption Includes assigned nodes under a process or operation that are of occurrence type MEConsumed. Excludes all process and operation nodes.
AccountabilityProcess Assignments Includes assigned nodes (including work areas, parts, and tools) under processes and operations. Excludes all processes and operations nodes. If the assigned-from structure is not loaded, those nodes are also excluded.
AccountabilityProcessAll NoAssign Include process and operation nodes.
AccountabilityProcessAll Include process and operation nodes and all of their assigned nodes. If the assigned structure is not loaded, their nodes are excluded.
AccountabilityProcessOnly WithPA Includes processes, operations, and process areas only.
ACPlantBOPDerivedProcesses AndOps Includes only operations and processes that are linked to the source (for example, in a product BOP). This rule is used when comparing a product BOP to a plant BOP and skips plant-specific operations.

Note

None of the inclusion rules include occurrence group nodes, but they can include the children under those nodes.