Running the accountability check when using the Quantity attribute with packed lines

When viewing quantity in packed lines, you see an accumulated quantity of all packed lines. However, when you choose to compare the Quantity attribute, the accountability check uses the quantity that is actually typed in per packed line. For example, there is one line in the source structure for which you type in a quantity of 3. Additionally, you have two target equivalent lines, each with a quantity of 3. After packing the two target lines, you see a quantity of 6 in the Quantity column. Running an accountability check on these lines produces a multiple match instead of a multiple partial match because the quantity is 3 on each source and target line.

Related Topics

  • Setting up the accountability check

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/id1674232 · retrieved 2026-07-11