Authoring manufacturing process plans > Creating Process Assembly Documents (PAD) > Working in the PAD pane
Rearrange the order of variants
Procedure
With the MEPSD object selected and the PSD view open, click in the Process Short Description section.Teamcenter opens the Variant Condition dialog box.
Select a variant condition from the list.
Use the Move Selected Line arrows beside the variant list to move the variant up or down in the list.
When you are satisfied with the list order, click OK.
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/PAD_rearrange_order · retrieved 2026-07-11