Change duration times

Procedure

  1. Make sure that the Lock editing button is off.

  2. Move the cursor over the end of the time bar until it changes to a double-ended arrow ↔.

  3. Drag the end of the bar to the desired duration time.

Results

Teamcenter changes the length of the activity time to reflect the new time.

Tip

Teamcenter displays the duration time in a tooltip, as well as in the Duration column of the Activities view.