ManufacturingKnowledge

High level work breakdown

Author a process plan for a small product

You can perform detailed process planning in Easy Plan with a work package that does not contain a product.

This feature allows you to bypass the

High Level Planning

page and directly access the

Process Planning

page. You can define generic work processes or create a process plan for a small product.

Prerequisites

You must set the EP_PlanningForSmallProduct value to true. In addition, you must add EP_PlanningForSmallProduct to the AWC_StartupPreferences in the Teamcenter rich client.

See Working with preferences in Active Workspace for a description of preferences and how to set them.

Procedure

  1. If you have not done so already, search for and open a work package, and then navigate to the Process Planning page.

  2. Author your process plan on the Process Planning page, and review it on the Line Balancing page as needed.

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.xid2214895/kvq3708253741943 · retrieved 2026-07-11