Authoring manufacturing process plans > Modifying process plan data
Edit activity resources
When you modify a process plan, you may need to add resources to an operation's activities or edit existing ones. All resources assigned to an activity are automatically assigned to its parent operation.
Procedure
Select an operation from the process structure.
Choose Open with→ Activities.
Select the activity to which you want to add resources.
Click the Edit Activity Occurrences button .The Edit Activity Occurrences dialog box is displayed. All resources currently assigned to the activity or the activity's parent operation are listed in the dialog box. Add and delete resources for the activity through this dialog box.
Do one of the following:
To
Do this
Delete existing resources
Select the resource to be deleted. To select multiple resources, hold either the shift key (for contiguous objects) or control key (for noncontiguous objects) while clicking resources.
Click < to remove selected resources from the list or click << to remove all resources from the list.
Assign additional resources
To assign a resource already in use by the activity’s parent operation, choose the resource from the Occurrences on Operation list and move it to the Occurrences on Activity list.
To assign a new resource from the classification hierarchy, click the Assign Resource button . The Classification Search Dialog is displayed.
Related Topics
- Searching for resources overview
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/pmpa0721 · retrieved 2026-07-11