Authoring manufacturing process plans > Managing requirements, trace links, and notes > Linking objects using trace links
About linking objects
A trace link establishes a path in which one object takes precedence over another. The trace link creates a directional relationship between the two objects, a relationship conveyed by the terms defining and complying. The predecessor, the defining object, is the trace link source. The successor, the complying object, is the target.
A defining object specifies a condition that a product or a component must fulfill.
A complying object partially or completely fulfills a condition specified by a defining object. Such a relationship establishes a traceable path in which one object precedes the other.
Only one trace link of a given subtype is allowed between the same two objects in the same direction. However, in a given direction between two objects, you can create as many trace links as the number of available trace link subtypes.
Note
Trace link is a subclass of the allocation class.
For more information about allocations, see Getting Started with Product Structure.
Related Topics
- Traceability in product design
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/c03a0002tl · retrieved 2026-07-11