To ensure compliance with quality control plans and regulations, you can associate control plans created in Teamcenter Quality with processes or process lines in a bill of process (BOP). Associated control plans can be opened for review and analysis, or disassociated from processes.

Prerequisites

Control plan objects must be created in Teamcenter Quality and the relevant templates installed. The Control Plan and Inspection Definition tabs are not displayed if the relevant templates are not available.

Use the preference EPControlPlanTabColumnConfiquration to configure the Control Plan tab columns.

Procedure

  1. From the Manage Work Package page, click High Level Planning .
    Note You can also associate and review control plans from process tabs on the Process Planning or Work Instructions Authoring task pages. You can navigate to either page from the High Level Planning task page, or from the Manage Work Package page if you working with small product mode enabled.

  2. In the BOP panel, select the process to which you want to associate or review control plans.

  3. In the information panel, select the Control Plans tab.

  4. Do any of the following.

                     Associate a control plan with the selected process.
                     Note 
                         A control plan can only be associated with a single
                             work package. 
                     
                     
                         Click Associate Control Plan
                                 .
                         In the Associate Control Plan dialog box, search for
                                 relevant control plans using standard characters, such as wild
                                 cards (*).
                         From the search results, select
                                 the one or more control plans and click Next .
                         Accept the default Revision Rule selection, and
                                 click Add.The control plan is associated with the selected
                                 BOP object.Note 
                                 
                                     
                                         Changing the revision rule will not affect the
                                             results even if the menu displays multiple revision
                                             rules.
                                     
                                     
                                         If you want to update a control plan
                                             revision, you must remove the association to the old
                                             control plan and then associate the new control plan
                                             revision with the BOP object.
                                     
                                 
                             
                     
                 
                 Review a control plan already associated with the
                     selected process. 
                         In the Control Plans tab, select the
                                 preferred control plan.
                         Click Open in New Tab
                                 .The
                                 control plan details are displayed in a new tab.
                     Tip 
                         To view and verify the associated BOP from the tab,
                             click the control plan Reference tab, and in the Reference Bill of Process, select
                             the BOP that the control plan is associated with, and then click
                                 Open
                             .
                     
                 
                     To disassociate a control plan from a process and
                         thereby from the entire work package, in the Control Plans tab, select the control plan to be
                         removed, and click Remove Control
                             Plan
                         .
    