Manage BOP > Product assignment > Plant BOP process area planning
Manage control plans associated with BOP processes
To ensure compliance with quality control plans and regulations, you can associate control plans created in Teamcenter Quality with processes or process lines in a bill of process (BOP). Associated control plans can be opened for review and analysis, or disassociated from processes.
Prerequisites
Control plan objects must be created in Teamcenter Quality and the relevant templates installed. The Control Plan and Inspection Definition tabs are not displayed if the relevant templates are not available.
Use the preference EPControlPlanTabColumnConfiquration to configure the Control Plan tab columns.
Procedure
From the Manage Work Package page, click High Level Planning .
Note You can also associate and review control plans from process tabs on the Process Planning or Work Instructions Authoring task pages. You can navigate to either page from the High Level Planning task page, or from the Manage Work Package page if you working with small product mode enabled.In the BOP panel, select the process to which you want to associate or review control plans.
In the information panel, select the Control Plans tab.
Do any of the following.
Associate a control plan with the selected process. Note A control plan can only be associated with a single work package. Click Associate Control Plan . In the Associate Control Plan dialog box, search for relevant control plans using standard characters, such as wild cards (*). From the search results, select the one or more control plans and click Next . Accept the default Revision Rule selection, and click Add.The control plan is associated with the selected BOP object.Note Changing the revision rule will not affect the results even if the menu displays multiple revision rules. If you want to update a control plan revision, you must remove the association to the old control plan and then associate the new control plan revision with the BOP object. Review a control plan already associated with the selected process. In the Control Plans tab, select the preferred control plan. Click Open in New Tab .The control plan details are displayed in a new tab. Tip To view and verify the associated BOP from the tab, click the control plan Reference tab, and in the Reference Bill of Process, select the BOP that the control plan is associated with, and then click Open . To disassociate a control plan from a process and thereby from the entire work package, in the Control Plans tab, select the control plan to be removed, and click Remove Control Plan .