ManufacturingKnowledge

Authoring manufacturing process plans > Configuring process structures > Configuring structures by occurrence effectivity

Create effectivity on multiple occurrences

Create and associate the same effectivity with several occurrences by selecting the appropriate line in the structure and choosing Tools→Effectivity→Occurrence Effectivity→Create on Multiple BOM Lines. The effectivity may be:

  • SharedShared effectivity must have an ID. If you are creating shared effectivity, ensure the Use shared effectivity check box is selected.

  • UnsharedUnshared effectivity has no ID. If you are creating unshared effectivity, ensure the Use shared effectivity check box is cleared.

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/occeff_creating · retrieved 2026-07-11