ManufacturingKnowledge

Authoring manufacturing process plans > Creating process structures > Sequencing processes with the PERT view

Assign parts in the PERT chart

Do one of the following:

  • Drag a part from a product, process, or work area structure to a process, operation, or activity PERT node.

  • Copy a part from a product, process, or work area structure. Right-click a PERT node and select Paste.

If the Show Assignments button is selected, the PERT node immediately displays the assignments. If the button is not selected, Teamcenter performs the assignments, but nothing is shown in the PERT node.

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/id1249979 · retrieved 2026-07-11