Manufacturing Process Planner general functionality > Visualizing structures > Managing product and manufacturing information (PMI)
Assign a PMI object to an operation
Procedure
- In the PMI Manager view, assign PMI objects to operations by doing one of the following.
Use the Copy and Paste commands.
Right-click a PMI object and choose Copy. Note To assign composite feature control frames (FCFs) to an operation, press Ctrl and click all FCFs that make up that composite.
In the process pane, select the appropriate operation and choose Paste.
Drag the part to the appropriate operation.
Assigning the PMI to an operation shares the values of specified properties with the operation. Any changes in these values in the structure automatically changes the values in the process.
- Edit PMI object information.
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/xid833711 · retrieved 2026-07-11