ManufacturingKnowledge

Authoring manufacturing process plans > Creating process structures

Open an existing process structure

Do one of the following

  • Open a process revision in the Manufacturing Process Planner using the Open Process dialog box.

  • Find the process revision item in My Teamcenter. Using the mouse, drag it to Manufacturing Process Planner in the navigation pane, or use the shortcut menu and choose Send To to send the item to Manufacturing Process Planner.

  • Open a product revision in Manufacturing Process Planner. All processes and work areas associated as target to this product open by default if the MSE_load_related_product_process_plant preference is set to true. However, to enable auto-loading of all the linked product structures and plant structures to a Bill of Process or Plant Bill of Process, the MELoadAllLinkedStructures preference should also be set to true.

Related Topics

  • Open structure by name

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/pmpa0402 · retrieved 2026-07-11