ManufacturingKnowledge

Manufacturing Process Planner general functionality > Comparing structures and propagating changes > Running an accountability check or propagation in batch mode

Configuring batch accountability check and propagation

You can schedule an accountability check or structure propagation to run at a later date or time or at a specific recurring time. This is helpful if you are comparing large structures where the action is time-consuming or if you require comparison results on a regular basis. Teamcenter uses the Dispatcher application to run the comparison and propagation at a time you specify.

Your administrator must configure this feature before you can use it.

Related Topics

  • Running an accountability check or propagation at a specified time

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/xid506306 · retrieved 2026-07-11