Designing process structure > Creating process structures > Importing structures using the tcexcel_import utility
Attaching forms
You can add forms to your structure, and fill out attributes within these forms. The following Microsoft Excel sheet shows an example of this.
| Header1 | Item | Item | Item | Description | Attribute |
|---|---|---|---|---|---|
| Header2 | Item | Item | Item | ItemRevision Master | |
| Header3 | Item | Item | Item | project_id | |
| Title | Root | Proc. Name | Op. Name | Description | Item Project ID |
| Product | New Product | Project xyz | |||
| Sub_Assy1 | New_Sub_Assy1 | Project 1 | |||
| Part1 | Desc of Part1 | Project 1 | |||
| Part2 | Desc of Part2 | Project 1 | |||
| Part3 | Desc of Part3 | Project 1 | |||
| Part4 | Desc of Part4 | Project 1 | |||
| Sub_Assy2 | New_Sub_Assy2 | Project2 | |||
| Part5 | Desc of Part5 | Project2 | |||
| Part6 | Desc of Part6 | Project2 | |||
| Sub_Assy3 | New_Sub_Assy3 | Project3 | |||
| Part7 | Desc of Part7 | Project3 |
Item Master and ItemRevision Master are keywords that signify that the values in those columns should be inserted into the master form or the revision master form, respectively, of the type specified in the Header2 row. The entry in the Header3 row specifies the attribute to be filled in by the given values. This must be in the internal format specified in the Business Modeler IDE application (for example, in the previous example, the Project ID string is shown in the user interface, but the string shown in the Business Modeler IDE application is project_id).
You can also add a form of your choice to the structure. In the following example, in addition to entering a value in the revision master form for program ID, you add the ImpactAnalysis form to the operations and fill in the cost estimate field with the given values.
| Header1 | Item | Item | Description | Attribute | Attribute |
|---|---|---|---|---|---|
| Header2 | Process | OP | ItemRevision Master | ImpactAnalysis Form | |
| Header3 | Process | OP | program_id | cost_estimate | |
| Title | Proc | Oper | Desc | AttrProgram # | Cost |
| Attribute_Test | F4711 0815 | ||||
| OP10 | Description for OP10 | F4711 0816 | 100.50 | ||
| OP20 | Description for OP20 | F4711 0817 | 123.45 | ||
| OP30 | Description for OP30 | F4711 0818 | |||
| OP40 | Description for OP40 | F4711 0819 | 200.00 | ||
| OP50 | Description for OP50 | F4711 0820 | 222.88 | ||
| OP60 | Description for OP60 | F4711 0821 | |||
| OP70 | Description for OP70 | F4711 0822 | 90.00 |
This results in the following structure.
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.pmphelp/ex_imp_attaching_forms · retrieved 2026-07-11