Releasing preliminary structures
Creating a dry run
Before creating a new item revision for a PDI, you can optionally make a dry run to validate the baseline. Teamcenter provides detailed status information about the structure. If there are any errors in the structure, Teamcenter displays their details, halts the baseline process, and does not release the structure. Your administrator can set a preference that determines if validation is always required before you create the baseline, or if you can validate the structure only when you consider it necessary.
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.plm00043/impa1501a · retrieved 2026-07-11