Authoring manufacturing process plans > Planning part movement – logistics
Assign stations to a provision area
To assist you in assigning a station to a provision process, you use the Logistics Station Resolver view. You can open this view on a variety of structures in the logistics BOP. The view helps you identify the station to which the raw material must be transported so it can be processed at a later date. The view lists the part family, supply chain, provision process, and candidate stations for the part and allows you to assign stations for the part directly in the view. When searching for candidate stations, Teamcenter searches for the part item in the plant BOP structure. When it finds the part, it looks for the assigned stations under the same parent process station. These stations are presented as candidate stations where you can assign them to the provision process. You can only assign one station to a provision process.
To assign stations to a provision area:
Procedure
- Right-click one of the following logistics structures and choose Open With→Station Resolver view.
Logistics BOP
Logistics folder
Logistics part family
In-plant supply chain
Logistics provision process
The provision areas that do not yet contain a station are marked with a question mark.
- Do one of the following:
If there is only one valid station listed per provision process, click Automatically Assign Station to have Teamcenter assign the stations for you.
If there are multiple possible stations found, assign them manually by right-clicking the station and choosing Assign Station or selecting the station and clicking Assign Station in the view toolbar. If there is already a station assigned, Teamcenter automatically unassigns the station and assigns the selected one.
The station is added to the provision area. Additionally, the status and the station in the Station Resolver view are marked with a green check mark.
To unassign a station:
Right-click the station in the table and choose Unassign Station or select the station in the table and click Unassign Station in the view toolbar.
To narrow the results in the table:
Enter a search string in the Filter box at the top of the view.
To update the view after making changes to the logistics BOP:
Click Refresh .
Setting up logistics planning
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/xid914164 · retrieved 2026-07-11