ManufacturingKnowledge

Managing the enterprise BOP > Synchronizing plant BOP and BOE structures

Open the connected process structure / Open connected plant structure

These options will open corresponding connected plant BOP and BOE structures.

  • Open connected Process Structure, Open connected Plant StructureThese options are only available or connected root of a BOE and a BOP.

  • Open connected Process StructureThis option is only available for a root plant BOE.

  • Open connected Plant StructureThis option is only available for a root plant BOP.

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/xid1396558 · retrieved 2026-07-11