Configuring the accountability check
Configure the accountability check to use net effectivity
Procedure
Configure unit effectivity to be valid for multiple effectivities.
Set the MEAccountabilityCheckEnableNetEffectivity preference.
This controls whether the accountability check mechanism checks for net effectivity.
- Implement a user exit and register a method for it in the Business Modeler IDE.
Related Topics
About occurrence effectivity
Visually compare EBOM to MBOM or BOM to BOP part assignments
Save accountability check settings
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.plm00260/id1108310 · retrieved 2026-07-11