ManufacturingKnowledge

Configuring the accountability check

Configure the accountability check to use net effectivity

Procedure

  1. Configure unit effectivity to be valid for multiple effectivities.

  2. Set the MEAccountabilityCheckEnableNetEffectivity preference.

This controls whether the accountability check mechanism checks for net effectivity.

  1. Implement a user exit and register a method for it in the Business Modeler IDE.

Related Topics

  • About occurrence effectivity

  • Visually compare EBOM to MBOM or BOM to BOP part assignments

  • Save accountability check settings

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.plm00260/id1108310 · retrieved 2026-07-11