ManufacturingKnowledge

Line balancing and detailed timing > Assign operations from Product BOP to stations > Plan plant BOP operations

Create operations

You can either create operations directly in the plant BOP or you can add operations from a functional plan (product BOP) to the plant BOP.

To create operations directly in the plant BOP, perform these steps:

Procedure

  1. Search and open or navigate to a process station.

The process station page is displayed.

  1. Click the Planning tab.

  2. Click Create Operation .

  3. In the Create Operation dialog box, select an operation type.

  4. Type a name in the Name box.

  5. (Optional) Type additional information in the Description box.

  6. Click Create.

  7. (Optional) You can create station reports.

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.xid2214895/xid1395577 · retrieved 2026-07-11