Multi-BOM Management general functionality > Multi-BOM Management fundamentals
Multi-BOM Management interface overview
| 1 | Toolbar | Provides a quick method for performing many of the most common tasks such as creating a structure, opening a structure by name, and adding resources. |
|---|---|---|
| 2 | Collaboration Context Tree view | Shows all open structures in the application. |
| 3 | Structure view | Shows each structure that is currently open in a separate view. A structure view contains, most commonly, a product, process, plant, or structure context. You can open multiple structures at once, including multiple products, processes or plants. A structure view is a primary view for which you can open multiple secondary views. |
| 4 | Manufacturing Features view | Shows all the features found under the currently selected scope. The Manufacturing Features view is an example of a secondary view opened for a primary product structure view. The blue border around the Manufacturing Features view and the product structure view shows that they are associated. |
| 5 | Detached structure view | Shows a process structure view that is detached from the Teamcenter window. You can detach and move any views to suit your needs. |
| 5 | Detached secondary view | Shows the PERT view that allows you to modify the flow of processes or activities in a graphical manner. You can detach secondary views and associate them with detached primary views. You can move the detached primary and secondary views anywhere in the display area, including to a second monitor. |
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.xid1364469/xid1369864 · retrieved 2026-07-11